
FOR PROFESSIONAL CATERING
Since 1973 Since 1973
Your cart is empty
Please enter your items to get a quote

+39 0721
813658
Roll sheeters
there are 12 products
SLIDER-PUSH-TILTING inclined with 1 Rollers pair of 300 mm, for 80/210 grams of bread, V 230/1, 0.25 kw, dimensions of 640x355x355h mm
technical card
Delivery from 4 to 9 days
IMPERIA Professional manual sheeter with 220 mm stainless steel rollers, size 325x220x275h mm
technical card
Delivery from 4 to 9 days
Sheeter-Pizza and Piadina with a COUPLE of 300 mm ADJUSTABLE ROLLERS, V 230/1, kw 0,37, dim.mm 420x420x370h
technical card
Delivery from 4 to 9 days
DOUGH SHEETER for HIGH PRECISION PASTA with 1 PAIR of ROLLED STAINLESS STEEL ROLLS long MM. 400, PREPARED for application TAGLIASFOGLIA TOOLS, - V. 230/1 - Kw. 0,37 - weight Kg. 45 - dimensions mm. 520x520x800h
technical card
Delivery from 4 to 9 days
HIGH PRECISION DOUGH SHEETER with 1 PAIR of ROLLED STAINLESS STEEL ROLLS mm. 300, PREPARED for application of LEAF CUTTER TOOLS, - V. 230/1 - Kw. 0.37 - weight Kg. 23 - dimensions mm. 420x420x370h
technical card
Delivery from 4 to 9 days
Complete range with 3 Models LENGTH Rollers: 320 - 420 - 520 mm,
in single-phase and three-phase version
Delivery from 4 to 9 days
IMPERIA Professional electric sheeter with 220 mm stainless steel rollers, V.230 / 1, Kw.0,19, dim.mm.300x220x250h
technical card
Delivery from 4 to 9 days
Electric SHEET CUTTER with 3 fixed cuts to choose from: 1.6 - 2 - 2/3 - 3 - 4 - 6/7 - 9 - 12/13 - 19 - 24 mm., maximum cutting width 180 mm, V. 230 /1.
technical card
Delivery from 4 to 9 days
Available with STAINLESS STEEL or WOODEN ROLLERS , three-phase version V 400/3, or single-phase V. 230/1
Delivery
version with STAINLESS STEEL or WOODEN ROLLERS 320 mm long , V 400/3, kW 0.60, dim. mm 550x350x400h
Delivery
version with STAINLESS STEEL or WOODEN ROLLERS 400 mm long, V 400/3, kW 0.60, dim. mm 640x350x400h
Delivery
Pasta sheeter with 500 mm LONG stainless steel rollers, V 400/3, kW 0.60, dim. mm 750x450x450h
technical card
Delivery from 4 to 9 days
